Description
Project details: Capital and maintenance Dredging work by cutter suction dredger for maintaining navigability of Char Romoni, Char Megha area of Dhaka Laxmipur River route at Meghna river including construction Earthen dyke and Torja walling for the year 2020-2021 to 2021-2022 (Package, Purto-01)
Employer: Bangladesh Inland Water Transport Authority (BIWTA)
Dredging Department (Level-7)
BIWTA Bhaban, 141-143, Motijheel C/A, Dhaka-1000.
Location: Laksmipur District
Number of Vessel deployed: 2
Manpower: 54
Dredged Volume Till date: 1370000 m3